Ref NoLDC/TD/1/29/7
TitleStructures 38, 42 & 44
Date1983-1994
TermUrban planning
AdminHistoryAs Phase II of Almondvale shopping centre was planned a number of other structures in the town centre were planned. Some of these, from the point of the Corporation, were relatively minor and included an underpass to the bus station (Structure 44) and a footbridge (42).
AccessStatusOpen
Extent4 files
ScopeandContent3 engineering and 1 planning file relating to associated developments and structures (i.e not the shopping centre) in Livingston town centre, 1983-1994.
    Powered by CalmView© 2008-2025