Skip to main content.
Medium FontSize
Larger FontSize
Largest FontSize
Home
Advanced Search
Catalogue
Persons
Places
Showcase
Image Gallery
Advanced Search
About the catalogue
Showcase
Image Gallery
Useful links
Contact Us
Hierarchy Browser
Some features of this page require JavaScript. Your browser does not support JavaScript, or you have disabled JavaScript. You will not be able to expand or collapse sections of the tree.
LDC - Livingston Development Corporation
BD - Corporation Board
CD - Commercial Directorate
CX - Chief Executive
FD - Financial and Management Services Directorate
PS - Property Services
TD - Technical Directorate
1 - Technical Directorate Registry
2 - Planning
3 - Architects
4 - Engineering
5 - Quantity Surveying
1 - Bills of Quantities and Tenders
2 - Final Measurements
3 - Final Accounts
1 - Additional insulation and general refurbishment at Knightsridge 5 & 6 byTom Turnbull Contractors (Linlithgow)Ltd.
2 - Almond Greenway Kirkton Phase 4 Several Works
3 - Almondvale Centre South East Entrance Improvements
4 - Almondvale Centre South East entrance improvements. Remeasurement of works byTom Turnbull Contractors (Linlithgow) Ltd
5 - Almondvale Minor Improvements
6 - Almondvale Road landscaping stage 3 Land Engineering (Scotland) Ltd
7 - Alteration at Lammermuir House for Computer Installation. By Fisher Group Scotland Ltd.
8 - Alteration to Farmhouse at Newyearfield.By A Crow.
9 - Alterations to Bloom Farm outbuildings. Kelly & Steel (Joiners/Builders) Ltd
10 - Alterations to Carmondean Community Centre, Nether Dechmont West Wing. By Barry D Trentham Ltd.
11 - Aluminium Window Repairs1986, 1987, 1988
12 - Bankton Road Phase 2, Contract 876034. By Wight Civil Engineering Ltd.
13 - Cavity Wall Insulation. Saveheat Insulations Ltd
14 - Central Heating Replacements Craigshill 2, Howden C and H
15 - Central Heating Replacements Deans 3 Area A
16 - Central Heating Replacements Deans 3 Area B
17 - Central Heating Replacements Howden D Area A
18 - Central Heating Replacements Howden D Area B
19 - Colour Treatment in Housing 94/95 Knightsridge 5 and 6
20 - Colour treatment in housing 1993/94 Phase 1, 51-110 Falconer Rise, Dedridge and communal stairs to flats, Howden B&K. DLO LDC
21 - Craigsfarm Community Centre - epoxy floor screeds.
22 - Craigsfarm Community Centre - heating and ventilation.
23 - Craigsfarm Community Centre - plumber work
24 - Craigshill 1 - Environmental Improvements
25 - Craigshill 1 Enviromental Improvements. By Hewden (Contracts) Ltd.
26 - Craigshill 1 Environmental Improvements
27 - Craigshill 1 environmental improvements by Hewden (Contracts) Ltd. see also 9001/449/30 at location A0016
28 - Craigshill 1, 50 dwellings replacement of heating installations. Drake & Scull (Scotland) Ltd
29 - Craigshill 4 East external painting 224 dwellings, 41 garages. JC Lindsay & Co Ltd
30 - Craigshill 5(1) Bett Bison flats phase 2A, by Mowlem (Scotland) Ltd.
31 - Craigshill 5(1), Bett Bison flats refurbishment phase 1 by Wimpey Construction (UK) Ltd.
32 - Craigshill 5(1), Bett Bison flats refurbishment phase 2B by Mowlem Scotland Ltd.
33 - Craigshill 8 & 9 (Inglewood and Exmouth Streets and Pine Grove) Replacement windows CR Windows
34 - Craigshill Jesperson Phase 1 and 2 Almondvale Skatepark - Soft Landscaping
35 - Craigshill Mall refurbishment. see also 9001/519/02 and 9001/519/06 at A0024
36 - Craigshill North and South Phase 4 Erection of New Pitched Roofs Jespersen Type Houses
37 - Craigshill Sheltered Housing Barry D Trentham Ltd
38 - Craigswood sports centre
39 - Crofthead Community Centre - electricalwork.
40 - Crofthead Community Centre - plumber work.
41 - Crofthead Community Centre by D H Crighton (Contractors) Ltd.
42 - Crofthead Farm Community Centre,Templar Rise, Dedridge West. Elerctrical installation to craft shop byForth Electrical Services Ltd.
43 - Deans 3 District
44 - Deans 3 Window replacement CR Window Systems
45 - Deans 6, 7, 8 external painting 321 dwellings. TP Dick
46 - Deans District Road Improvements
47 - Deans District Road Improvements Hard Landscape Works
48 - Deans East 1 Tot Lots (CompletionContract).
49 - Deans East Loop Road Phase 3, Contract 574043. By R J McLeod (Contractors) Ltd.
50 - Deans South improvements, repairs and painting by Bruce Rutherford.
51 - Deans South Upgrading of 51 and 165 Dwellings
52 - Deans South West Improvements
53 - Dedridge 1 & 2 (Everard, Falconer &Herald Rises) replacment windows Sunline Frames Ltd
54 - Dedridge 4B window replacement DLO LDC
55 - Dedridge 7 & 8 housing, 243 dwelling &228 garages by J Harrison (Contracts)Ltd.
56 - Dedridge 9 & 10 (Clement Rise) replacement windows Sunline Frames Ltd
57 - Dedridge 12B replacement windows Anglian Windows Ltd Commercial Division
58 - Dedridge burn greenway, hard landscaping by Tom Turnbull Contractors (Linlithgow) Ltd.
59 - Eliburn East 3A Housing. By Muir Construction Ltd.
60 - Eliburn East 3B & 3C, 62 dwellings Muir Construction
61 - Eliburn East 3D Muir Construction
62 - Eliburn North West Landscaping
63 - Ex-sorting office to form car showroom.by Balfour Beatty Construction
64 - External paintwork at Ladywell West 1 by Thom Decorators Ltd.
65 - External re-painting Deans East 1.By Mitchell of Edinburgh Ltd.
66 - External re-painting of 10 houses at Dedridge 11. By MRO
67 - External re-painting of 11 houses at Craigshill 4 West. By LDC DLO.
68 - External re-painting of 24 houses at Howden C. By LDC DLO.
69 - External re-painting of 26 houses at Knightsridge 9. By MRO
70 - External re-painting of 28 houses at Howden F. By Andrew Little.
71 - External re-painting of 29 houses at Dedridge 13A. By J C Lindsay & Co Ltd.
72 - External re-painting of 35 houses at Craigshill 8. By LDC DLO.
73 - External re-painting of 35 houses at Eliburn 2B. By MRO.
74 - External re-painting of 49 houses at Craigshill 10. By MRO
75 - External re-painting of 50 houses at Ladywell West 1. By LDC DLO.
76 - External re-painting of 55 houses at Deans Sheltered Housing and Deans East 1 By Bruce Rutherford Painting Contractor.
77 - External re-painting of 55 houses at Dedridge West 2. By LDC Department of Works.
78 - External re-painting of 56 houses at Knightsridge 2. By MRO
79 - External re-painting of 61 houses at Deans 12. By LDC Department of Works.
80 - External re-painting of 63 houses at Deans 2. By MRO
81 - External re-painting of 64 houses at Carmondean 4 East and Eliburn East 2A.By LDC Department of Works.
82 - External re-painting of 67 houses at Howden L. By LDC DLO.
83 - External re-painting of 82 houses at Knightsridge 1. By MRO
84 - External re-painting of 111 houses at Eliburn East 3 (A, B & C).By B Rutherford Decorators.
85 - External re-painting of 116 houses at Knightsridge 6. By LDC Department of Works
86 - External re-painting of 119 houses at Deans 3. By LDC Department of Works.
87 - External re-painting of 124 houses at Knightsridge 5. By LDC Department of Works
88 - External re-painting of 126 houses at Dedridge 12B. By B Rutherford, Painting Contractor.
89 - External re-painting of 135 houses at Howden A. By LDC Department of Works.
90 - External re-painting of 135 houses at Knightsridge 11. By MRO
91 - External re-painting of 158 houses at Carmondean 3. By LDC Department of Works
92 - External re-painting of 161 houses at Howden M. By Mackay Decorators (Perth)Ltd.
93 - External re-painting of 181 houses at Howden E. By LDC DLO.
94 - External re-painting of 198 houses at Howden B&K. By J C Lindsay & Co Ltd.
95 - External re-painting of 211 houses at Dedridge 3. By MRO
96 - External re-painting of 233 houses at Dedridge 4. By MRO
97 - External Repainting Work of 73 Dwellings Deans East 3, Dedridge West 4, DeansEast 2, Knightsridge 4 and Carmondean 2
98 - Fire damaged house, D M Hall
99 - Footbridge over Dedridge West, Crofthead, Contract 574055. By Murdoch MacKenzie Ltd.
100 - FP 31A Houstoun Industrial Estate Livingston. Roofing repairs byTilling Construction Services Ltd
101 - FP 31B Houstoun Industrial Estate Livingston. Roofing repairs by Briggs Amasco Ltd.
102 - FP 046 Unit 6B Grange Road Houstoun IE. CE Nathanial & Co
103 - FP 78 Deans Industrial Estate by Armiscot Developments Ltd.
104 - FP 081 Extension for Crown Cork Co Ltd Houstoun IE. Miller Construction
105 - FP 082 Several Works
106 - FP 101 Scottish Postal Board Sorting Office, Howden West Livingston by Wimpey Construction UK
107 - FP 101A sorting office Howden West alterations by CE Nathanial & Co
108 - FP 125 advance units at Howden West, Livingston.
109 - FP 131 Raand Systems, alterations to 4 Young Square, Brucefield Ind. Park, by Balfour Beatty Construction (ScotlandLtd.
110 - FP 144 Brucefield Industrial Estate by J Miller & Partners Ltd.
111 - FP 165 - structural steelwork.
112 - FP 165, Union Carbide, Deans South West
113 - FP 167 Phase 2, Kirkton CampusTender by Miller Construction (Northern) Ltd.
114 - FP 187 Houstoun Industrial Estateby Miller Construction Ltd.
115 - FP 198 Landscaping
116 - FP 198 Landscaping Work
117 - FP 198 several works.
118 - FP 198 several works. See also 9039/001/22
119 - FP 200 Advance Factory Units Deans South West MJ Gleeson (Northern) Ltd
120 - FP 222 Deans South West IE. By Norwest Holst (Scotland) Ltd.
121 - FP 223 Several Works
122 - FP 244 several works, see also 9039/002/01
123 - FP 244 several works.
124 - FP 244 Soft Landscaping
125 - FP 244 Soft Landscaping Work
126 - FP 245, Simpson Parkway, Kirkton Campus. Miller Construction
127 - FP 254 Houstoun Industrial Estate by Laing Scotland.
128 - FP 259 Kirkton Campus, remedial work by John Laing Construction Ltd.
129 - FP 270, Alterations at 2 Cochrane Square. By Barry D Trentham Ltd.
130 - FP 271 Kirkton Campus. GA Construction Ltd
131 - FP 272 Remeasurement of several works done by Maxi Construction Ltd
132 - FP 275 Soft Landscaping
133 - FP 275 Soft Landscaping Work
134 - FP 275, Houstoun IE
135 - FP 279 Kirkton Campus. Hall and Tawse
136 - FP 279 Kirkton Campus. Supply and erection of structural steelwork. Nominated sub-contract Severfield-Reeve Structures
137 - FP 281 Kirkton Campus. John Laing Construction Ltd
138 - FP 286, Alteration to 2 & 4 Cochrane Square By Hall & Tawse Ltd.
139 - FP 288 Lindsay Sq, Deans IE. Several works Barry D Trentham Ltd
140 - FP 288 Lindsay Sq, Deans IE. Soft Landscaping
141 - FP 288 Lindsay Sq, Deans IE.Several Works
142 - FP 289 Brucefield IE. Several works Hall & Tawse Scotland Ltd
143 - FP 289 Several Works
144 - FP 290 Brucefield IE. Tarmac Construction (Scotland) Ltd
145 - FP 298 Kirkton Campus. Several works Hall & Tawse Scotland Ltd
146 - FP 298 Several Works
147 - FP 298 Soft Landscaping
148 - FP 299 Kirkton Campus. Several works Hall & Tawse Scotland Ltd
149 - FP 299 Several Works
150 - FP 299, Fleming Rd, Kirkton Campus. Soft Landscaping
151 - FP 300, Bain Sq, Kirkton Campus
152 - FP 300, Bain Sq, Kirkton Campus
153 - FP 301, Kirkton Campus
154 - FP 302, Gregory Rd, Kirkton Campus
155 - FP 302, Gregory Rd, Kirkton Campus
156 - FP 305, Bell Sq
157 - FP 147 alterations and extensions
158 - FP 147 Precommissioning contract Balfour Beatty
159 - FP 150 Vehicle Washbay and yard extension
160 - FP 174 nominated subcontract supply and erection of structural steelwork
161 - FP 278, Craft Workshops at Livingston Village.
162 - Gas central heating at Craigshill 4 Westby Lafferty Construction Ltd.
163 - Gas Central Heating at Howden 'D'District
164 - Gas central heating at Howden E (Ryebank) by Lafferty Construction Ltd.
165 - Gas central heating at Howden E, area B (Sedgebank) by Lafferty Construction Ltd.
166 - Gas Central Heating Replacements Craigshill 2 - Howden C and H
167 - Gas Central Heating Replacements Howden A Phase 6 Contracts A2 and A3
168 - Hard Landscaping at Almond Greenway Howden By Ritchie Brothers (PWC) Ltd.
169 - Hospital Interchange Environmental improvementsTom Turnbull Contractors (Linlithgow)Ltd
170 - Housing at Deans East 4 & 5.Traditional housing by J Smart & Co.
171 - Housing at Deans East 12.Several works by Wimpey Construction UK Ltd.
172 - Howden A & P Loft insulation 511 dwellings. Insu Insulation
173 - Howden C & H refurbishment of flat roofs. Raynor Roofing Lt
174 - Howden C and H Pitched Roof Refurbishment
175 - Howden Central Area improvements ERDC Civil Engineering Ltd
176 - Howden G (Heatherbank, Larchbank,Lochbank) environmental improvements - painting of houses. B Rutherford
177 - Howden G Provision of Pitched Roofs
178 - Installation of 253 Tumble Driers at Craigshill 5(1) DLO LDC
179 - Killandean Burn Greenway Ph.3 Hard and Soft Landscaping
180 - Kitchen replacements at Deans South by W & J R Watson Ltd.
181 - Kitchen unit replacement at Craigshill 1 North. See also 9001/316/01 and 9001/379/20
182 - Kitchen unit replacement at Craigshill 1 South by Esmond Smith Construction plc.
183 - Kitchen unit replacement at Craigshill 2 by Esmond Smith Construction plc
184 - Kitchen Unit Replacement at Deans 3 and Howden F. By LDC DLO.
185 - Kitchen Unit Replacement at Howden A.By LDC DLO.
186 - Kitchen Unit Replacement at Howden M.By LDC DLO.
187 - Kitchen Unit Replacement at Howden P.By LDC DLO.
188 - Kitchen Unit Replacement at Knightsridge 4. By LDC DLO.
189 - Kitchen Unit Replacement at Knightsridge 5 & 6. By LDC DLO.
190 - Kitchen Unit Replacement at Knightsridge1 & 2. By LDC DLO.
191 - Kitchen unit replacement contract 2 at Craigshill 3, 4 East, 5(2), 6, 7, 8 & 9.
192 - Kitchen unit replacement contract 3 at Deans 2 and Howden C, D & M by MRO.
193 - Kitchen unit replacement contract 4 at Howden E by J Robertson (Builders) Ltd.
194 - Kitchen unit replacement contract 5 at Craigshill 5(1) by Esmond Smith Construction plc
195 - Kitchen Unit Replacements Carmondean 4 (East and West)
196 - Kitchen Unit Replacements Deans 4, 5, 6, 7 and 8
197 - Kitchen Unit Replacements Dedridge 1, 2, 3, 4, 7, 8, 9, 10 and 11
198 - Kitchen Unit Replacements Dedridge 12A, 12B
199 - Kitchen Unit Replacements Dedridge 13A, 13B and 13C
200 - Kitchen Unit Replacements Howden G - Howden L - and Craigshill 4 West
201 - Knightsridge 1 & 2 replacement windows Anglian Windows Ltd Commercial Division
202 - Knightsridge 5 and 6 Fencing
203 - Knightsridge 11 271 houses by J Smart &Co (Contractors) Ltd.
204 - Knightsridge Adventure Playground Shelter. By Tom Turnbull Ltd.
205 - Ladywell East District Road - Almondvale Park West - Soft Landscaping
206 - Ladywell East District Road Almondvale Park West Soft Landscaping
207 - Ladywell East Environmental Improvements
208 - Ladywell West 2B, Section B, Building Works. By Morrison Construction Ltd.
209 - Ladywell West 4 Section B as executed by Miller Construction Ltd
210 - Landscaping at Alderstone Road phase 4 by Scottish Landscaping Ltd
211 - Lanthorn Pond, Dedridge Fencing by G Ross Contractors.
212 - Livingston village improvements by Ritchie bros. PWC Ltd.
213 - Lochshot Burn Greenway Phase 2 Land Engineering Scotland Ltd
214 - Loft Insulation 660 dwellings Deans 4-8 and 12. Refracpac Ltd
215 - Loft Insulation at Dedridge 1, 2, 3 & 4.By McCarney & Reid Ltd.
216 - Loft Insulation at Dedridge 7, 8, 9 & 10 By McCarney & Reid Ltd.
217 - Loft Insulation at Dedridge 11, 12A & Band Knightsridge 9. By McCarney & Reid Ltd.
218 - Loft Ventilation at Howden A & P. By McCartney & Reid Ltd.
219 - Management contract FP 151
220 - Murieston water greenway phase 3 by Tom Turnbull Contractors (Linlithgow) Ltd. See also 9001/517/03 at locationA0024
221 - Murieston Water Greenway Phase 4
222 - Murieston Water Greenway Phase 4
223 - Murieston water greenway phase 4 by Land Engineering Scotland Ltd.
224 - Revised Final. Account Summary: Murieston Water Bank - Protection Works
225 - Newyearfield Farm Business Units-Several Works
226 - Newyearfield Farm Roof Repairs
227 - Newyearfield Farm Roof Repairs
228 - Newyearfield Farmhouse Wall Treatments By Damp Wall Treatment Ltd.
229 - Newyearfield Play Area Hard landscaping
230 - Oil Museum and Heritage Centre
231 - Oil Museum and Heritage Centre
232 - Oil Museum and Heritage Centre
233 - Oil Museum and Heritage Centre - hardlandscaping.
234 - Peel Park Hard Landscaping
235 - Peel Park hard landscaping.
236 - Peel Park Phase 4 Hard landscaping Land Engineering (Scotland) Ltd
237 - Pitched Roofs to Craigshill 1 North Single Storey Housing. By Tarmac Cubitts
238 - Re-surfacing of stairways at Craigshill 5 (1) Phase 1a by Veitchi (Scotland) Ltd
239 - Re-surfacing of stairways at Craigshill 5 (1) Phase 1b by Veitchi (Scotland) Ltd
240 - Re-surfacing of stairways at Craigshill 5 (1) Phase 4b by Veitchi (Scotland) Ltd
241 - Re-surfacing of stairways at Craigshill 5 (1) Phase 4c by Veitchi (Scotland) Ltd
242 - Refurbishment of 5 storey blocks, Deans South by Tarmac Construction Ltd.
243 - Refurbishment of 5 storey blocks, Howden M by McGregor Construction Ltd.
244 - Refurbishment of 5 Storey Building Howden D
245 - Refurbishment of 313 Houses at Knightsridge 4. By Wimpey Construction Ltd.
246 - Refurbishment of Elson Hot Water Tanks at Dedridge 7 & 8. By Andrew Brash.
247 - Refurbishment of Elson Hot Water Tanks at Dedridge 9 & 10. By Andrew Brash.
248 - Refurbishment of Garages, Craigshill Phase 2. By Aitkenhill Construction Ltd.
249 - Refurbishment of Nether Dechmont Farmhouse.
250 - Remedial work to frost damaged houses at Ladywell West 4 as carried out by Heggie & Waddell
251 - Replacement of fittings damaged by dezincification and provision of gaswater circulators at Deans 1. By Drakeand Skull (Scotland) Ltd.
252 - Replacement of fittings damaged by dezincification at Craigshill 1 & 2 and Craigshill 5, 7, 8 & 9 extension contract.By MRO.
253 - Replacement of Fittings Damaged by Dezincification at Craigshill Phase 1.By MRO
254 - Replacement of fittings damaged by dezincification at Craigshill Phase 3. By Simpson McLaren Ltd.
255 - Replacement of fittings damaged by dezincification at Howden D, E & M and Craigshill 2 extension contract.By MRO
256 - Replacement of heating installationsat Craigshill 1. By Drake & Skull Ltd.
257 - Replacement of heating installationsin 54 Patio Houses Deans South. By Scottish Gas.
258 - Roughcast Repairs Deans East 1. By Hart Builders Ltd.
259 - Service Pipe Alterations at Ladywell West 1. By Drake and Skull (Scotland) Ltd.
260 - Several trades at Dedridge 4 (completion by Messrs. Hart Builders.
261 - Several works at FP 006A, Refurbishment by R H Davidson Ltd.
262 - Several works FP 38 Houstoun Industrial Estate by Melville, Dundas & Watson Ltd.
263 - Several works, Deans East 3 by Hart Builders Ltd.
264 - several works, shop at Livingston Village by Messrs C E Nathaniel & Co.
265 - Sheltered housing at Deans.
266 - Soft landscaping at Craigshill Jespersen Phases 1 & 2 and Almondvale Skatepark. By Scottish Landscaping Ltd.
267 - Soft landscaping at Livingston North Station by Munro Landscapes Ltd.
268 - Supply and Erection of Structural Steelwork
269 - Tender document for FP 31B Houstoun IE. Remedial works by Tarmac Regional Construction.
270 - Tender document for heating and ventilation work at Craigsfarm, Maree Rd Craigshill by Frasers & Sons.
271 - Tender document for internal floor finishes at Craigsfarm, Maree Rd Craigshill by Protective Services (Contracts) Ltd
272 - Tender document for plumbing workat Craisgfarm, Maree Road, Craigshillby W A Farrell.
273 - Tender document for re-roofing/repairwork at Craisgfarm, Maree Road, Craigshill by Tarmac Construction.
274 - Tender document, management contractfor L E E Ltd, 1 Fleming Road Kirkton Campus. Alterations andextension.
275 - Tenders for Ladywell West 4 Housing 152 Dwellings
276 - Tree and shrub planting at Almondvale Car Parks by Bellwood Landscape Co Ltd.
277 - Vacant houses, Fairclough.
278 - Variation Orders 2 - 6. Deans District Road (East Leg), Contract 204902. By Jacksons (Edinburgh) Ltd.
279 - Westfield Quarry Park Hard Landscaping
280 - Westfield Quarry Park. Hard landscaping. RJ Levack
281 - Window Replacement Craigshill 5(2) and 7
282 - Window Replacement Dedridge 4A
283 - Window Replacement Knightsridge 5 and 6
284 - Work carried out at Deans Service Industry, St. Andrews Way, Deans by Mitchell of Edinburgh.
4 - Other Tender Documentation
5 - Project Management
6 - Payment Books
7 - Microfilm
6 - Technical Library
7 - Countryside Ranger Service
8 - Lothian and Edinburgh Enterprise Limited (LEEL)
Powered by
CalmView
© 2008-2024